<
<
Eric Patrick Ford

Eric Patrick Ford

Senior Researcher

erfo@norceresearch.no
+47 51 87 56 17
Nygårdsgaten 112, 5008 Bergen, Norway

Eric Patrick Ford

Division

Energy & Technology

Research Groups

Brønnoperasjoner og risikostyring

More information about Eric Patrick Ford

See profile in Cristin

Open resume

Projects
See all
See all
Publications
Wellbore Characteristics that Control Debonding Initiation and Microannuli Width in Finite Element Simulations – Journal of Petroleum Science and Engineering 2020
Comparative Analysis of Permanent P & A Requirements and Consequences in Terms of Leakage - A Case Study – 2019
Time-to-failure estimation of barrier systems in permanently plugged and abandoned wells – 2019
Environmental risk assessments as input to a decision-making process : examples from a barents sea prosject – 2019
Permanent P&A Design - What is Good Enough? – 2018
Leakage Calculator for Plugged-and-Abandoned Wells – SPE Production & Operations 2018
Consequence Quantification of Barrier System Failures in Permanently Plugged and Abandoned Wells – 2018
Down Time Terms and Information Used for Assessment of Equipment Reliability and Maintenance Performance – 2017
LBr-1 – research CO2 storage pilot in the Czech Republic – Energy Procedia 2017
A comparison of FEP-analysis and barrier analysis for CO2 leakage risk assessment on an abandoned Czech oilfield – Energy Procedia 2017
Maintenance data collection for subsea systems: A critical look at terms and information used for prediction of downtime – 2017
Establishment of a Quantitative Risk-Based Approach for Evaluation of Containment Performance in the Context of Permanently Plugged and Abandoned Petroleum Wells – 2017
Leakage Calculator for Plugged and Abandoned Wells – 2017
A Probabilistic Approach for Pressure Control Evaluation in the Well Planning Phase – Oil, Gas 2015
BlowFlow - Next Generation Software for Calculating Blowout Rates – 2014
BlowFlow - Next Generation Software for Calculating Blowout Rates – 2014
Improved Underbalanced Operations With Uncertainty Analysis – 2014
Uncertainty based Approach for Predicting the Operating Window in UBO Well Design – SPE Drilling & Completion 2013
See all publications in Cristin